The project included the installation of a new hybrid stitched pitch, incorporating undersoil heating to ensure consistent playability throughout the year. In addition, a new dedicated goalkeeper (GK) training area was constructed, also finished with a hybrid stitched surface, providing durability and performance for intensive, position-specific training.