The works included the installation of new drainage and irrigation systems, improving water management and ensuring consistent surface conditions throughout the season. To enhance resilience and longevity, a HERO hybrid carpet system was installed, providing greater stability and allowing the pitch to withstand higher levels of use while maintaining playability.




